VANTAGEINTEGRITY

KNOW THE CONDITION.
PLAN WITH CONFIDENCE.

Pressure vessels

Look closely at the details that matter.

Illustrative horizontal process pressure vessel on two saddle supports, with welded shell, flanged nozzles and bolted manway

Inspection areas to consider

  • Shell and head measurement locations
  • Weld seams and nozzle connections
  • Supports and external surface condition

A condition record is one input to an engineering assessment. An inspection alone does not establish fitness for service.

Define the question.
Then the examination.

Vessel geometry, material and service history shape the inspection approach. A component-level plan connects the inspection location to the question being investigated.

Useful information to prepare

  • Equipment identifier, material and drawings
  • Service conditions and previous inspection records
  • Accessible areas and expected outage window
Build your vessel brief

Methods to explore

Explore the purpose and limits of each method. Material and site conditions determine the final inspection approach.

Start with the question you need answered.

Request a proposal